This project was complicated by the relatively long clear span of 13 metres over the track and train speeds of 100MPH. The span of the bridge was designed using Hakitec 750 modular beams.
DDA compliant continuous ‘not cold to touch’ handrails were installed, with GRP tread covers on the steps and resin based anti-slip paint on the landings.