...
A temporary pedestrian footbridge with a 15m span formed with Hakitec 750 alloy beams....
...
...
...
A lift shaft in a six storey building required modification at the base to enable a new door to be installed. TR Scaffol...
RMDK R700 truss panels were used to form a 50 meter service supporting bridge during railway an over-bridge refurbishmen...
...
The existing main building of a maintenance depot required a major roof refurbishment. The works were required to be car...
The existing passenger footbridge at Yatton train station, Somerset required minor refurbishment in order to extend the ...
A Hakitec 750 temporary roof with an offset ridge which allowed the roof to pass over the high turrets without substanti...
RMD Superslim facade retention was used to laterally restrain the facade of the old Crocodile works....
On the banks of the River Usk near Newport, flood alleviation works required a drilling rig to be supported on a horizon...
A 40m long x 25m wide crash deck bridged across the existing swimming pool to allow access for soffit works as well as p...
Swansea Railway Station required an access scaffold crash deck to the underside of the canopies on each of the four plat...
The existing footbridge at Bicester North railway station required encapsulation for grit blasting which required a temp...
As part of a massive rejunevenation programme along Weston Super Mare's sea front, a dry stone arch 8m high x 14m long w...