TR Scaffolding were awarded the contract to provide a scaffold around the existing foot bridge to facilitate minor steel work repair and deck replacement. A temporary footbridge was installed to provide safe access across the rail lines while the existing one was being repaired. TR Scaffolding designed and installed this staircase and bridge using SGB Cuplok public access staircase components and Haki 750 bridging beams.This project was complicated by the 100MPH maximum speed limit, which imposed a potential uplift load on the scaffold structure of over 7 tonnes.