Newport Flood Alleviation Scheme

newport-flood-alleviation-scheme-image-1
newport-flood-alleviation-scheme-image-2
newport-flood-alleviation-scheme-image-3

On the banks of the River Usk near Newport, flood alleviation works required a drilling rig to be supported on a horizontal temporary platform, with the platform positoned on the river bank itself.

The RMD Superslim frame, with sheet piles fixed to the legs, was prefabricated elsewhere.

RELATED PROJECTS