Kingswood Leisure Centre

kingswood-leisure-centre-image-1
kingswood-leisure-centre-image-2
kingswood-leisure-centre-image-3
kingswood-leisure-centre-image-4

Temporary access at Kingswood Leisure Centre was needed to carry out the necessary roof repairs. A 40m long x 25m wide crash deck bridged across the existing swimming pool to allow access for soffit works as well as permitting safe access for trades in the pool.

TR Scaffolding were awarded the contract to provide external scaffold and and an interior birdcage access to facilitate the works.

RELATED PROJECTS